External Separation Firewalls For Live Biomass Plant, Barry

DNO Consulting Ltd

Background 

As recent changes have been made to the fire safety regulations required for energy plants across the UK, Stancold worked with DNO Consulting Ltd to carry out an external firewall installation in Barry.

Process

Stancold’s strong technical expertise within internal fire-rated partitioning paired with DNO Consulting Ltd’s experience in the high voltage industry was key in being able to successfully develop the concept and design for this external firewall.

The structure was to sit between a generator and reactor, so in the unlikely event of a fire, it will act as a core barrier against the spread of flame.

Solution

Stancold installed Eurobond Mineral Fibre 125mm thick panels to form the partitions, complete with an externally treated finish to be able to withstand the outdoor elements. The team also completed fireboarding to the steelwork and overcladding in steel, offering maximum durability to the structure.

Health and safety was paramount during this project, as the client’s machinery on site remained operational. This was carefully planned and executed throughout by Stancold’s project management and installation team, ensuring a safe working environment. This project was completed on schedule and handed over to a satisfied end user.

Contact Shaun Jones with your enquiry

Our extensive firewall knowledge helped to develop the concept for this project

Edwin Drew, Project Manager
Location Barry
Building Use Biomass Plant
Panel Core Mineral Fibre
Panel Supplier Eurobond
Panel Thickness 125mm
Panel Requirements 56m²
Services Project Management
CAD Design
Qualified Installers