Semi-Flush Cleanroom

Snazaroo

Background

Due to continuous growth in product ranges and increase of global demand, our customer required a semi-flush cleanroom for the mixing of fine powder pigments and cosmetic ingredients to produce their 100% skin friendly paraben and fragrance-free paints.

Requirement

Our scope of works consisted of a semi-flush ISO 8 cleanroom installation accommodating machinery and air vents, complete with a built-in atrium functioning as a high care changing area.

Solution

Stancold engineered a solution with a cleanroom panel system suitable for the application and achieving considerable savings for the customer.

Stancold specified a panel system capable of supporting 4 apertures for filters, supplied 3 vision panels, 3 transparent swing doors for better light conditions and security reasons.

Contact Mark Kendrick with your enquiry

You are very professional. We are very pleased with the installation and would recommend you to anyone.

Adrian Ryan, Snazaroo
Project Semi Flush Cleanroom Installation
Location Minehead, Somerset
Building Use Facepaint Production
Panel Core PIR
Panel Supplier Kingspan
Panel Thickness 50mm, 80mm
Panel Facing White Cleanable uPVC Hygienic Finish
Panel Requirements 70m²
Doors/Windows 15mm Swing Doors, 3 Vision Panels