Sub-Dividing Firewalls for Six Industrial Units, Hemel Hempstead

Bailey Construction

Background 

Stancold’s specialist knowledge of passive fire protection and a competitive quotation won the tender with local construction contractor, Bailey Construction, within a new industrial park complex in Hemel Hempstead.

Process

In our first project with the contractor, our experienced team met with Bailey Construction on site to complete site surveys and design meetings. This enabled Stancold to offer a value-engineered solution that was suitable for the project’s requirements.

Together, Bailey Construction and Stancold successfully planned the installation of the fire-rated sub-dividing partitions across six new industrial units on the complex.

Solution

Stancold constructed a number of sub-dividing walls, each with a fire rating of one hour, using Eurobond Firemaster panels of 125mm thickness, installed vertically.

Specialist firestopping also accompanied the composite panels to the head and sides of each complete partition, achieving full fire integrity.

Our team’s strong expertise and industry experience of fire-rated partitions were essential in developing a solution that adhered to both the required building safety regulations and key budgetary factors.

Contact Shaun Jones with your enquiry

We formed a great partnership with the contractor on this project

Edwin Drew, Project Manager
Location Hemel Hempstead
Building Use Industrial Park
Panel Core Mineral Fibre
Panel Supplier Eurobond
Panel Thickness 125mm
Panel Requirements 1135m²
Services Project Management
LPS Approved Installation
CAD Design
Site Surveys